Iterations¶
Summary of project work in interations.
S01 ( 06.03.2023 - 19.03.2023 )¶
- selection of a suitable IDE - Visual Studio
- specification of requirements
- agreement that everyone has to learn c++ (nobody knows c++)
- introduction to cMake
- gitflow settings
- setting meeting times (Saturday 9:00 (planning + retrospective) + Wednesday 17:00)
S02 ( 20.03.2023 - 26.03.2023 )¶
- getting the program up and running
- source code analysis
- workshop with the client about cMake and project requirements
- creation of a project plan
- configuration of Redmine and setting conventions
Retrospective¶
GLAD:SAD:
- TK - Vasek made a nice plan
- TK - Compared to the previous sprint we are more coordinated, more efficient
- MJ - Better planning
- JK - Clarifying the procedure with the mentor
MAD:
- TK - I don't really understand the code
- JK - The code is complicated
- VŠ - we are a little behind schedule
- VŠ - we need to correctly specify the requirements for each task (optimizing is not a sufficient description)
S03 ( 27.03.2023 - 02.04.2023 )¶
- workshop with the client about mathematical background of the project and source code structure
- risk analysis document prepared
- vision document prepared
- source code analysis of ARAP and PBD
Retrospective¶
GLAD:
- JK - the meeting with the author of the project was very useful
- TK - the meeting with the author helped me to get a better understanding of the code
- VŠ - the meeting with the author was good
- VŠ - we made up for the initial delay in the plan
- TK - Vasek played nicely with the administration
SAD:
- TK - I analyzed a lot of things, but I still don't feel like I have a proper understanding of how everything works
- JK - lots of work, little time
- VŠ - Mathematically challenging project, big overhead for analysis
- VŠ - We will descope cMake refactoring to the next sprint
MAD:
- VŠ - We still have a big slippage, we should escalate the situation better
- VŠ - Tomas writes Czech in Redmine
- VŠ - We need to improve communication in the team, we don't have a very good overview of the status of the individual tasks
S04 ( 03.04.2023 - 09.04.2023 )¶
- consultations with client about PBD and ARAP merge
- architecture document first part prepared
- internal convention document prepared
- resolving super-build issue
Retrospective¶
GLAD:
- JK - better understanding of the mathematical part of the method
SAD:
- JK - a team member couldn't handle the time pressure
- JK - high mental load
MAD:
- TK - MJ left us
- VŠ - basically zero progress on Cmake, I started implementing from scratch
- VŠ - missing team member + delay on cMake will make big problems for on-time delivery
S05 ( 10.04.2023 - 16.04.2023 )¶
- Setting new targets - removing a task for comparison of results
- Testing is unlikely to be as high quality due to time constraints
Retrospective¶
GLAD:
- TK - The client is helpful and supportive
- VŠ - We have the first implementation deliverable
- VŠ - Improved team communication
- VŠ - Moving the meeting to Sunday evening is better for closing tickets
- TK - I better understand the connection of building c++ projects (Cmake etc.)
- JK - positive feedbakc from ASWI mentor
- TK - Vasek made nice documents => lots of points on ASWI evaluation
- VŠ - team morale is not dropping (probably could now be less now)
SAD:
- JK - Mental state remains unchanged
- VĚ - Every step of putting together a project results in a problem that blocks development
MAD:
- TK - I'm already on my second week of almost 0% progress and it's severely demoralizing (despite X hours spent on the task)
Actionable points¶
- Trying to get the project to a state where we can start implementing as soon as possible
- Help from the author + focus on the build process
- Lunch together to boost team morale
- Incorporate deadlines from other coursework into deadline planning
S06 ( 17.04.2023 - 23.04.2023 )¶
- oSim superbuild is working now on Win
- Fixing an unexpected bug that was in our project
- ARAP method - the project is in a state where we can address the combination of both methods
- We have received from the project author his proposal for a solution to the combination of methods
Retrospective¶
GLAD:
- JK - quite a lot of implementation progress
- JK - having lunch with the team was beneficial, I got motivated to continue my studies
- TK - finally something is working -> big boost to morale
- TK - Client satisfied with our bug fix
- VŠ - One big feature was descoped, according to our new plan, we should be able to delivery everything on time
SAD:
- JK - time pres from other subjects
- TK - I'm scared that we won't be able to get everything done in time
- VŠ - In superbuild there is often a problem with external libraries (can't be translated, not compatible, other problems) - this creates blockers that prevent further progress and are time-consuming to resolve (hard to estimate time to resolve these kind of problems)
MAD:
- TK - I managed to forget about half of the mathematical background
Previous actionable points outcomes¶
- Project is now in runnable state - perfect
- Lunch together to boost team morale was good
Actionable points¶
- Create a prototype of the combination of PBD & ARAP methods
- Implement at least one of the two possible combinations (using scales or using a combination of kinetic forces)
- Would be helpufull to have one GIT repo for both features, current situation might lead in merge issues