Summary of project work in interations.
S01 ( 06.03.2023 - 19.03.2023 )¶
- selection of a suitable IDE - Visual Studio
- specification of requirements
- agreement that everyone has to learn c++ (nobody knows c++)
- introduction to cMake
- gitflow settings
- setting meeting times (Saturday 9:00 (planning + retrospective) + Wednesday 17:00)
S02 ( 20.03.2023 - 26.03.2023 )¶
- getting the program up and running
- source code analysis
- workshop with the client about cMake and project requirements
- creation of a project plan
- configuration of Redmine and setting conventions
Retrospective¶
GLAD:SAD:
- TK - Vasek made a nice plan
- TK - Compared to the previous sprint we are more coordinated, more efficient
- MJ - Better planning
- JK - Clarifying the procedure with the mentor
MAD:
- TK - I don't really understand the code
- JK - The code is complicated
- VŠ - we are a little behind schedule
- VŠ - we need to correctly specify the requirements for each task (optimizing is not a sufficient description)
S03 ( 27.03.2023 - 02.04.2023 )¶
- workshop with the client about mathematical background of the project and source code stucture
- risk analysis document prepared
- vision document prepared
- source code analysis of ARAP and PBD
Retrospective¶
GLAD:
- JK - the meeting with the author of the project was very useful
- TK - the meeting with the author helped me to get a better understanding of the code
- VŠ - the meeting with the author was good
- VŠ - we made up for the initial delay in the plan
- TK - Vasek played nicely with the administration
SAD:
- TK - I analyzed a lot of things, but I still don't feel like I have a proper understanding of how everything works
- JK - lots of work, little time
- VŠ - Mathematically challenging project, big overhead for analysis
- VŠ - We will descope cMake refactoring to the next sprint
MAD:
- VŠ - We still have a big slippage, we should escalate the situation better
- VŠ - Tomas writes Czech in Redmine
- VŠ - We need to improve communication in the team, we don't have a very good overview of the status of the individual tasks
S04 -¶