Aktivita
Od 2023-03-26 do 2023-04-24
2023-04-24
-
06:31 Feature #10500 (Closed): S07 - Merge using kinetic powers - part 1
- Integration of merge realized in another way. Will be continued in next sprint.
-
06:29 Feature #10499 (Closed): S07 - Merge using weights
- One possible solution of merge.
-
06:26 Task #10498 (Closed): S07 - Internal meetings (planning + retro)
- - planning & retrospective
- knowlage sharing
-
06:24 Task #10497 (Closed): S07 - Architecture document finish
- Completion of the mandatory application architecture document
-
06:23 Bug #10496 (Closed): S07 - cMake Discregrid & FCL bugfixing
- There is currently an issue with building cMake with the Eigen library that affects Discregrid and FCL. We need to fi...
-
06:21 Feature #10495 (Closed): S07 - CI/CD Gitlab analysis
- Attempt to integrate the build via gitlab
-
06:18 Feature #10439 (Closed): S06 - Merge of PBD and ARAP
-
06:17 Feature #10439 (Resolved): S06 - Merge of PBD and ARAP
-
06:18 Bug #10437 (Closed): S06 - Eigen library build
-
06:17 Bug #10437 (Resolved): S06 - Eigen library build
-
06:18 Task #10436 (Closed): S06 - Internal meetings (planning + retro)
-
06:17 Task #10436 (Resolved): S06 - Internal meetings (planning + retro)
-
06:18 Task #10435 (Closed): S06 - Correction of errors from meeting with mentor
-
06:16 Task #10435 (Resolved): S06 - Correction of errors from meeting with mentor
-
06:18 Feature #10434 (Closed): S06 - Integration of cMakes into the project
-
06:16 Feature #10434 (Resolved): S06 - Integration of cMakes into the project
-
06:17 Bug #10438 (Invalid): S06 - Potential build issue buffer
-
06:16 Task #10433 (Closed): S06 - Build document finish
-
06:16 Task #10432 (Closed): S06 - Creation of new plan
2023-04-23
-
16:31 Task #10432 (Resolved): S06 - Creation of new plan
-
09:45 Task #10433 (Resolved): S06 - Build document finish
2023-04-16
-
18:22 Feature #10439 (Closed): S06 - Merge of PBD and ARAP
- Beginning of method merge implementation
-
18:21 Bug #10438 (Invalid): S06 - Potential build issue buffer
- In case there is another problem during the build, it must be solved.
-
18:20 Bug #10437 (Closed): S06 - Eigen library build
- Issue during PBD build with Eigen library (linking)
-
18:13 Task #10419 (Closed): S05 - ASWI meeting with mentor
-
18:13 Feature #10363 (Closed): S05 - CI/CD analysis
-
17:12 Feature #10363 (Resolved): S05 - CI/CD analysis
-
18:12 Feature #10361 (Closed): S05 - Attempting the first implementation output of the method merge
-
18:12 Feature #10359 (Closed): S05 - Completing of cMake on Windows
-
18:12 Task #10357 (Closed): S05 - Internal meetings (planning + retro)
-
18:12 Bug #10356 (Closed): S05 - Resolving build issue
-
17:31 Task #10436 (Closed): S06 - Internal meetings (planning + retro)
- - planning & retrospective
- knowlage sharing
-
17:30 Task #10435 (Closed): S06 - Correction of errors from meeting with mentor
- * due date in interations
* target users
* non-functional requirements -
17:25 Feature #10434 (Closed): S06 - Integration of cMakes into the project
- Currently, cMakes are created individually for each library. They need to be merged and integrated into the project (...
-
17:22 Task #10433 (Closed): S06 - Build document finish
- The document describes how the project will be build, part of the Architecture document.
-
17:21 Task #10432 (Closed): S06 - Creation of new plan
- A new plan needs to be drawn up and a decision made on which functionalities will not be implemented.
2023-04-13
-
14:41 Task #10419 (Resolved): S05 - ASWI meeting with mentor
-
14:39 Task #10419 (Closed): S05 - ASWI meeting with mentor
- Regular status check with mentor
-
14:39 Hodnocení 2.-4. iterace
- h2. Hodnocení
8,5+9,5+10
h2. Malus/Bonus
* možný bonus technická kvalita plánu + build - TBD
h2. Doporučení... -
12:13 Bug #10356 (Resolved): S05 - Resolving build issue
2023-04-10
-
17:31 Feature #10363 (Closed): S05 - CI/CD analysis
- Investigate implementation options, compare and select a suitable solution procedure.
-
17:29 Feature #10362 (Closed): E - CI/CD
- Epic for CI/CD.
Main goal: Automatic build when change is detected in the repository.
-
17:26 Feature #10361 (Closed): S05 - Attempting the first implementation output of the method merge
- First analysis done. Advanced implementation + client consultation.
-
17:19 Feature #10359 (Closed): S05 - Completing of cMake on Windows
- Completing the superbuild on Windows.
-
17:15 Task #10279 (Closed): S04 - Attempting the first implementation output of the method merge
-
17:15 Feature #10281 (Closed): S04 - Run cMake on windows
-
17:11 Task #10304 (Closed): S04 - Internal Convention document creation
-
17:11 Task #10301 (Closed): S04 - Prepare of Architecture document
-
17:11 Task #10280 (Closed): S04 - Internal meetings (planning + retro)
-
17:11 Task #10280 (Resolved): S04 - Internal meetings (planning + retro)
-
17:10 Task #10278 (Closed): S04 - Analysis of mathematical operations
-
17:09 Task #10278 (Resolved): S04 - Analysis of mathematical operations
2023-04-08
-
16:38 Task #10301 (Resolved): S04 - Prepare of Architecture document
-
16:31 Task #10301 (New): S04 - Prepare of Architecture document
-
16:37 Task #10304 (Resolved): S04 - Internal Convention document creation
-
08:14 Task #10357 (Closed): S05 - Internal meetings (planning + retro)
- - planning & retrospective
- knowlage sharing -
07:53 Bug #10356 (Closed): S05 - Resolving build issue
- An error sets up during the project build that blocks further progress
-
07:47 Task #10302 (Closed): S04 - Retrospective integration into Redmine
-
07:46 Task #10303 (Closed): S04 - Creating views in RedMine
-
07:46 Task #10303 (Resolved): S04 - Creating views in RedMine
2023-04-03
-
11:46 Task #10302 (Verified): S04 - Retrospective integration into Redmine
-
11:32 Task #10302 (Closed): S04 - Retrospective integration into Redmine
- Overwriting an internal google document in redmine
-
11:46 Task #10301 (Assigned): S04 - Prepare of Architecture document
-
11:45 Task #10301 (Resolved): S04 - Prepare of Architecture document
-
11:28 Task #10301 (Closed): S04 - Prepare of Architecture document
- Create an architecture document, mandatory for ASWI
-
11:36 Task #10304 (Closed): S04 - Internal Convention document creation
- Writting down our internal conventions to be avalible for all team members and mentors.
-
11:34 Task #10303 (Closed): S04 - Creating views in RedMine
- * for timesheets of each team member
* for current sprints
* cumulative results -
10:15 Task #10288 (Closed): S03 - CMake refactoring
-
06:05 Task #10288 (Closed): S03 - CMake refactoring
-
10:14 Task #10202 (Closed): S03 - Internal meetings (planning + retro)
-
10:14 Task #10202 (Resolved): S03 - Internal meetings (planning + retro)
-
10:12 Task #10199 (Closed): S03 - New method for muscle deformation
2023-04-02
-
07:40 Feature #10281 (Closed): S04 - Run cMake on windows
- After analysis, modify the cMake code to make it usable for Windows.
-
07:21 Task #10280 (Closed): S04 - Internal meetings (planning + retro)
- - planning
- retrospective
- escalation of the situation if necessary
- know-how transfer -
07:16 Task #10279 (Closed): S04 - Attempting the first implementation output of the method merge
- After analyzing the problem, we will try to implement the first solution, which we will then consult with the client.
-
07:13 Task #10278 (Closed): S04 - Analysis of mathematical operations
- To become familiar with the mathematical formulas used in the project
-
07:11 Feature #10277 (Closed): E - New method for muscle deformation
- Epic backlog for implementation of new method for muscle deformation ( core task of our project)
-
07:04 Task #10200 (Closed): S03 - Specification of the requirements
-
07:03 Task #10201 (Closed): S03 - Workshop with author of the project
-
07:03 Task #10270 (Closed): S03 - Potential risks
-
07:03 Task #10271 (Closed): S03 - Vision
-
07:02 Task #10272 (Closed): S03 - Corrections from the 1st iteration evaluation
-
07:02 Task #10276 (Closed): S03 - Artifacts refactoring
2023-03-31
-
20:20 Task #10276 (Closed): S03 - Artifacts refactoring
- - aesthetic changes to the wiki page and filling in missing information
2023-03-28
-
19:32 Task #10272 (Closed): S03 - Corrections from the 1st iteration evaluation
- - add labels to tickets
- finalize LCO
- add link to google sheets where internal communication is recorded -
19:25 Task #10271 (Closed): S03 - Vision
- Elaboration of the project vision
-
19:21 Task #10270 (Closed): S03 - Potential risks
- Preparation of a document containing possible risks
-
19:19 Task #10200: S03 - Specification of the requirements
- Addition of information about the project assignment for correct processing of the necessary document.
-
19:19 Task #10201: S03 - Workshop with author of the project
- Meeting with the author of the project Martin Červenka about ambiguities in the code.
-
18:40 Task #10198 (Closed): S02 - Meeting with mentor
-
18:40 Task #10197 (Closed): S02 - Internal meetings
-
18:40 Task #10133 (Closed): S02 - Familiarising with the code
-
18:40 Task #10132 (Closed): S02 - CMake refactoring
2023-03-27
-
10:31 Hodnocení 1. iterace
- h2. Hodnocení
6
h2. Doporučení
* CICD materiály (CW predmetu, Teams - Tools and howtos)
* využít zájmu jednoh...
2023-03-26
Také k dispozici: Atom