Aktivita
Od 2023-03-04 do 2023-04-02
2023-04-02
-
07:40 Feature #10281 (Closed): S04 - Run cMake on windows
- After analysis, modify the cMake code to make it usable for Windows.
-
07:21 Task #10280 (Closed): S04 - Internal meetings (planning + retro)
- - planning
- retrospective
- escalation of the situation if necessary
- know-how transfer -
07:16 Task #10279 (Closed): S04 - Attempting the first implementation output of the method merge
- After analyzing the problem, we will try to implement the first solution, which we will then consult with the client.
-
07:13 Task #10278 (Closed): S04 - Analysis of mathematical operations
- To become familiar with the mathematical formulas used in the project
-
07:11 Feature #10277 (Closed): E - New method for muscle deformation
- Epic backlog for implementation of new method for muscle deformation ( core task of our project)
-
07:04 Task #10200 (Closed): S03 - Specification of the requirements
-
07:03 Task #10201 (Closed): S03 - Workshop with author of the project
-
07:03 Task #10270 (Closed): S03 - Potential risks
-
07:03 Task #10271 (Closed): S03 - Vision
-
07:02 Task #10272 (Closed): S03 - Corrections from the 1st iteration evaluation
-
07:02 Task #10276 (Closed): S03 - Artifacts refactoring
2023-03-31
-
20:20 Task #10276 (Closed): S03 - Artifacts refactoring
- - aesthetic changes to the wiki page and filling in missing information
2023-03-28
-
19:32 Task #10272 (Closed): S03 - Corrections from the 1st iteration evaluation
- - add labels to tickets
- finalize LCO
- add link to google sheets where internal communication is recorded -
19:25 Task #10271 (Closed): S03 - Vision
- Elaboration of the project vision
-
19:21 Task #10270 (Closed): S03 - Potential risks
- Preparation of a document containing possible risks
-
19:19 Task #10200: S03 - Specification of the requirements
- Addition of information about the project assignment for correct processing of the necessary document.
-
19:19 Task #10201: S03 - Workshop with author of the project
- Meeting with the author of the project Martin Červenka about ambiguities in the code.
-
18:40 Task #10198 (Closed): S02 - Meeting with mentor
-
18:40 Task #10197 (Closed): S02 - Internal meetings
-
18:40 Task #10133 (Closed): S02 - Familiarising with the code
-
18:40 Task #10132 (Closed): S02 - CMake refactoring
2023-03-27
-
10:31 Hodnocení 1. iterace
- h2. Hodnocení
6
h2. Doporučení
* CICD materiály (CW predmetu, Teams - Tools and howtos)
* využít zájmu jednoh...
2023-03-26
-
08:49 Task #10198 (Assigned): S02 - Meeting with mentor
-
08:49 Task #10197 (Assigned): S02 - Internal meetings
-
08:48 Task #10133 (Assigned): S02 - Familiarising with the code
-
08:48 Task #10132 (Assigned): S02 - CMake refactoring
2023-03-25
-
08:56 Task #10202 (Closed): S03 - Internal meetings (planning + retro)
-
08:51 Task #10201 (Closed): S03 - Workshop with author of the project
-
08:49 Task #10200 (Closed): S03 - Specification of the requirements
-
08:40 Task #10199 (Closed): S03 - New method for muscle deformation
- - solution proposal
- design
- meet with author of current code -
08:33 Task #10198 (Closed): S02 - Meeting with mentor
-
08:32 Task #10197 (Closed): S02 - Internal meetings
-
08:30 Task #10125 (Closed): S01 - Communication and meetings
-
08:30 Task #10128 (Closed): S01 - Meeting with the client
-
08:30 Task #10131 (Closed): S01 - C++ introduction
-
08:30 Task #10130 (Closed): S01 - Project global scope
-
08:30 Task #10129 (Closed): S01 - Gitflow
-
08:30 Task #10127 (Closed): S01 - ASWI meetings
-
08:29 Task #10126 (Closed): S01 - Internal meetings
2023-03-19
-
16:54 Task #10133 (Closed): S02 - Familiarising with the code
-
16:51 Task #10132 (Closed): S02 - CMake refactoring
-
16:49 Task #10131 (Closed): S01 - C++ introduction
-
16:47 Task #10130 (Closed): S01 - Project global scope
- * Division of work (category + responsible role) + time estimation of category
* Project planning
* Gantt Chart
-
16:43 Task #10129 (Closed): S01 - Gitflow
-
16:38 Task #10128 (Closed): S01 - Meeting with the client
-
16:37 Task #10127 (Closed): S01 - ASWI meetings
-
16:34 Task #10126 (Closed): S01 - Internal meetings
-
16:33 Task #10125 (Closed): S01 - Communication and meetings
Také k dispozici: Atom