Aktivita
Od 2021-02-15 do 2021-03-16
2021-03-16
-
19:48 Task #8320 (Closed): Iteration 1 - Planning
-
19:25 Task #8320 (Assigned): Iteration 1 - Planning
-
19:25 Task #8335 (Accepted): Analyze connection between Unity and the original Qt application
-
19:25 Task #8326 (Accepted): Create base Unity project
-
19:25 Task #8321 (Accepted): Vision document (v1)
-
19:24 Task #8321 (Assigned): Vision document (v1)
-
19:25 Task #8322 (Assigned): Requirements document (v1)
-
19:25 Task #8322 (Accepted): Requirements document (v1)
-
18:53 Task #8325 (Closed): Pick version of Unity Engine
-
18:53 Task #8325: Pick version of Unity Engine
- Version selected on It1 planning: 2020.3.0f1
-
18:37 Task #8290 (Closed): "Battle plan" discussion meeting
-
18:05 Task #8344 (Closed): Iteration 1 - Mid-iteration standup
2021-03-15
-
19:03 Task #8335 (Closed): Analyze connection between Unity and the original Qt application
- Will the applications use local TCP (or UDP) sockets to talk to each other?
What will the protocol look like? -
18:39 Task #8291 (Closed): Meeting with the ČVUT client
-
08:25 Task #8291 (Resolved): Meeting with the ČVUT client
-
11:44 Task #8326 (Closed): Create base Unity project
- Create a base Unity project and commit it to Git. Base requirement is to have the project Git-friendly, i.e. should b...
-
11:43 Task #8325 (Closed): Pick version of Unity Engine
-
11:38 Task #8324 (Closed): Iteration 1 - Retro
-
11:37 Task #8323 (Closed): Iteration 1 - Demo
-
11:36 Task #8322 (Invalid): Requirements document (v1)
-
11:35 Task #8321 (Closed): Vision document (v1)
-
08:23 Task #8320 (Closed): Iteration 1 - Planning
-
08:00 Revize c137512e (aswi2021virtual-surreality-gitlab): Add original application sources
2021-03-11
-
09:59 Task #8291 (Closed): Meeting with the ČVUT client
-
09:57 Task #8290 (Closed): "Battle plan" discussion meeting
2021-03-08
-
19:39 Task #8253 (Closed): Initialization meeting with ASWI mentor
-
19:39 Task #8254 (Closed): Initialization meeting with the client
-
12:21 Task #8254 (Resolved): Initialization meeting with the client
2021-03-07
-
20:43 Task #8254 (Closed): Initialization meeting with the client
- Body k diskusi převzaté z ASWI prezentace:
* Požadavky
* Technologie
* Produkční prostředí
* Současná implemen... -
20:42 Task #8253 (Resolved): Initialization meeting with ASWI mentor
-
20:39 Task #8253 (Closed): Initialization meeting with ASWI mentor
2021-02-26