Retrospective and planning after iteration 3 » Historie » Revize 8
Revize 7 (Jan Pašek, 2021-04-09 12:40) → Revize 8/16 (Jan Pašek, 2021-04-09 12:44)
h1. Retrospective and planning after iteration 3
*Date:* 09.04. 2021, 15:00
*Present:* Jan Pašek, Michal Seják, Stanislav Král, David Friesecký
h2. Agenda
# Each of the team briefly evaluates the pros and cons of the iteration based on the following points: project state, project plan, team cooperation, tools, artefacts
# What shall be better in the next iteration?
# How did we managed to change problematic points from the previous retrospective?
# Other problems
# Evaluate if we achieved the iteration targets
# Synchronization discussion (short standup)
# Planning of the next iteration
h2. Conclusion
# Evaluation of the iteration:
* Honza: Targets were met, software architecture was built from scratch which was exhausting work.
* David: Estimations shall be improved for the future, but it shall be better next time. The rest of the work was OK.
* Michal: Best iteration, joyful tasks. No other comments.
* Standa: Big overshoots of the task estimations. Architecture is implemented and ready to be extended.
# Review process shall be improved. Maybe a walk-through review can be done.
# Estimations shall be significantly better.
# Design update process was established.
# *All iteration targets were met*
# _.srl file remains in the project root - serial number handling shall be treated in a different way
# GUI - if self-signed is selected, CA shall be checked and blocked. Self-signed certificates are automatically enforced to be CA in the application core.
# RestAPI cannot return code 409 - shall be removed from the specification