Akce
Wiki » Historie » Revize 8
« Předchozí |
Revize 8/18
(rozdíl)
| Další »
Premek Brada, 2015-09-16 14:56
Wiki¶
Original text for collecting ideas (shared on Drive).
Plan and review of steps
- week 17th Aug 2015 -- analysis of meta-data, db logical model, UI paper prototypes
- done: UI paper prototypes, meta-data basic parser/extractor
- week 7th Sept 2015
- finalized UI prototype with real samples from meta-data (PDF scans here under DMSF), complete meta-data parser/extractor with API, app architecture draft
- have work recorded by issues in bugtracker, linked commits in git repo
- done: paper prototype, DB schema draft; the rest deadline 16.9.
- week 14th Sept 2015
- done: initial backlog, base commits, system archtiecture core
- 8.10.2015 9am
- have a "null" version of complete system working on http://students.kiv.zcu.cz/~someone (database + app core + view template all functioning together on one basic usecase/functionality)
- complete backlog in redmine, with related tasks as needed
Aktualizováno uživatelem Premek Brada před více než 9 roky(ů) · 8 revizí